© 2016 Rio Grande Basin Roundtable. All Rights Reserved.

Rio Grande Basin Roundtable

WSRA Awarded Rio Grande Basin Projects - Listed Chronologically 

  • Alamosa River Watershed Restoration Project 
  • Preliminary Design Multi-use Rio Grande Reservoir Rehabilitation and Enlargement
  • Hydrologic Recharge Feasibility Study for the Rio Grande Basin Augmentation- Phase I
  • Culebra Watershed Vallejos Ditch Headgate Replacement
  • Sanchez Reservoir Rehabilitation - Ph I Assess. & Upgrade
  • Conejos River System Confluence Management Project
  • Platoro Reservoir Crest of Dam Repair
  • Rio Grande Initiative: North Rio Grande Ranch Conservation Easement
  • Water 2012: The RG Basin Partnering for CO. Water Future
  • Quantifying Mogote/Romero Flows & Effects on the Conejos System
  • Conejos Groundwater Monitoring and Analysis
  • Campbell-Ridden Property & Dugan Ranch Conservation Easement Projects
  • Conejos River System Gauging Stations Project
  • Plaza Project - Phase 3: Prairie Ditch Implementation Project
  • Santa Maria Reservoir Siphon & Canal System Rehab
  • “Narrowing the Gap” for Colorado’s Water Future
  • Educating Today to Balance Tomorrow's Water Supplies & Needs
  • Rio Grande - Mountain Home Reservoir Dam Outlet Works Upgrade Feasibility Study
  • Rio Grande Initiative: Haywood Ranch Conservation Easement
  • Kerber Creek Restoration Project - Middle Parcel
  • Conservation Reserve CREP Phase II
  • Solicitation of Stakeholders Input & Advice through publication of a Rio Grande Edition of Headwaters Magazine
  • Rio Grande - Kerber Creek Restoration Project
  • 2008 Rio Grande Riparian Stabilization Project
  • Radar Monitoring & Hydrologic Modeling in the Upper RG Basin 
  • Drip Irrigation Field Trial for Sustainable Potato Cropping in the San Luis Valley
  • San Luis Peoples Ditch Upgrade and Rehabilitation Project - Ph I
  • The McDonald Ditch and Plaza Project, Phase I Planning
  • Plaza Project 2: McDonald Ditch Implementation Project and Supplemental Funding
  • Meeting the Rio Grande Basin Roundtable's Public Education & Public Outreach Goals
  • Conejos River and North Branch Diversion and Stabilization
  • Lower Willow Creek Restoration Project
  • Platoro Reservoir Restoration
  • 2009 Rio Grande Riparian Stabilization Project - Phase 4
  • Sangre de Cristo Trinchera Diversion Canal Restoration
  • Santa Maria Reservoir Phase 2 - Continental Dam and Spillway Restoration
  • Shortfall Request - Sangre de Cristo Trinchera Diversion Canal Restoration
  • Lower Willow Creek Restoration Project: Phase 2
  • Sanchez Reservoir Phase 2 - Outlet Rehabilitation and Gate Tower Replacement
  • Alamosa River In-stream Flow Project
  • San Antonio River - El Codo Ditch Diversion and Rehabilitation
  • Santa Maria and Continental Reservoirs: Rehabilitation and Multiple Use Studies
  • Conejos North Branch Water Conservation and Management
  • Terrace Reservoir Spillway Replacement 
  • Romero-Guadalupe Channel Rectification Project 
  • Rio Grande - Increasing the Water Holding Capacity of Soil for Agricultural Sustainability in the San Luis Valley 
  • Rio Grande County Hydro geologic Study 
  • Rio Grande - Rehabilitation and Ditch Lining 
  • Rio Grande Reservoir Multi-Use Rehabilitation: Refinement and Enhancement of Reservoir Reoperation and Optimization Model
  • Rio Grande Initiative 
  • Rio Grande Basin Implementation Plan Phase 1 and Phase 2

Check back for a more up to date list, as we are constantly adding new projects. Thanks!